POBETONCONTACT STANDARD

POBETONCONTACT STANDARD

Pobetoncontact Standard
It is laid on internal and external smooth concrete surfaces. Pobetoncontact is ready for use. Before applying it is strongly recommended to mix the product well and add 10% clean water. It is laid manually using a cylindrical roller. The drying time is 24 hours.

Download Technical Data

Technical Details

Pobetoncontact Standard
It is laid on internal and external smooth concrete surfaces. Pobetoncontact is ready for use. Before applying it is strongly recommended to mix the product well and add 10% clean water. It is laid manually using a cylindrical roller. The drying time is 24 hours.

 

Preparation and application Parameters
Time for application after mixing with water 2 h.
Drying time of material 12 h.
Application thickness 1 – 2 mm.
Granulation 0-1.2 mm.
Consumption 350 g/m2.
The temperature of the air and surface +5/+25°C
Color
Kg bag 10/20
Bags/pallet 60/36