POBETONCONTACT STANDARD

POBETONCONTACT STANDARD

Pobetoncontact Standard
It is laid on internal and external smooth concrete surfaces. Pobetoncontact is ready for use. Before applying it is strongly recommended to mix the product well and add 10% clean water. It is laid manually using a cylindrical roller. The drying time is 24 hours.

Download Technical Data

Technical Details

Pobetoncontact Standard
It is laid on internal and external smooth concrete surfaces. Pobetoncontact is ready for use. Before applying it is strongly recommended to mix the product well and add 10% clean water. It is laid manually using a cylindrical roller. The drying time is 24 hours.

 

Preparation and applicationParameters
Time for application after mixing with water2 h.
Drying time of material12 h.
Application thickness1 – 2 mm.
Granulation0-1.2 mm.
Consumption350 g/m2.
The temperature of the air and surface+5/+25°C
Color
Kg bag10/20
Bags/pallet60/36